Aluminium Shuttering Works (Mivan Formwork)
Now a Days Aluminium formwork is very popular due to its light weight, durability and finish it gives to concrete surface.
This checklist provides a check points to engineer to ensure correct execution of work and avoid reworks.
Its very difficult having repairs later and cost huge and may cause losses to owner if not executed properly.
Checklist for Aluminium Formwork consist of following checkpoints in it;
Sample Checklist for Aluminium Formwork is attached herewith.
Checklist is a important record it helps us in order to get work done correctly and it ensure we do not miss any point to check which is important from aspect of Quality of work.
Checklist attached herewith is just a sample provided for your reference, work carried out as per this procedure may have different sets of standards, material specifications, standard operating procedures and terms and conditions for doing that work. This all parameter or some parameter may not match with one you are executing at your Project.
Kindly use it as reference document only to create Checklist. You are free to modify edit, delete add any content in it and use it as per your requirement.
Now a Days Aluminium formwork is very popular due to its light weight, durability and finish it gives to concrete surface.
This checklist provides a check points to engineer to ensure correct execution of work and avoid reworks.
Its very difficult having repairs later and cost huge and may cause losses to owner if not executed properly.
Checklist for Aluminium Formwork consist of following checkpoints in it;
- Deviation report for survey record (kicker level)
- Dimension of room checked as per drawing
- Diagonal check done for room
- All formwork has been cleaned and coated with release agent
- Flat wall ties installed with proper tie sleeves
- Verticality checked for external as well as internal wall
- Check all pins and wedges
- Check verticality of all props
- Check outer tie for external beam and sunk portion
- Slab soffit formwork level
- Door spacer installed as per drawing issued
- Vertical soldiers installed as per drawing
- All kicker level have been lined and adjusted accordingly
- All kicker bolts installed correctly
- All excessive spaces between rocker and floor level have been sealed
Sample Checklist for Aluminium Formwork is attached herewith.
Checklist is a important record it helps us in order to get work done correctly and it ensure we do not miss any point to check which is important from aspect of Quality of work.
Checklist attached herewith is just a sample provided for your reference, work carried out as per this procedure may have different sets of standards, material specifications, standard operating procedures and terms and conditions for doing that work. This all parameter or some parameter may not match with one you are executing at your Project.
Kindly use it as reference document only to create Checklist. You are free to modify edit, delete add any content in it and use it as per your requirement.