Work Checklist - Back Filling Work

Dnyan Deshmukh

Staff member
Back Filling Work
After creation of foundation of structure we generally do back fill the excavated portion. This checklist helps you in doing it in correct way.

Checklist of Back Filling Work consist of following checkpoints in it;
  • Backfilling material approved
  • Material free from impurities
  • Bottom levels taken/noted
  • Rock pieces not greater than 150mm
  • Filling layers not greater than 150mm (or as directed by incharge)
  • Watering of layers filled
  • Proper compaction by approved method /machinery.
  • Slopes maintained if required
  • Top levels taken
  • Field density tested and results approved by incharge

Please find attached checklist for back filling work.

Checklist is a important record it helps us in order to get work done correctly and it ensure we do not miss any point to check which is important from aspect of Quality of work.
Checklist attached herewith is just a sample provided for your reference, work carried out as per this procedure may have different sets of standards, material specifications, standard operating procedures and terms and conditions for doing that work. This all parameter or some parameter may not match with one you are executing at your Project.
Kindly use it as reference document only to create Checklist. You are free to modify edit, delete add any content in it and use it as per your requirement.
 