Work Checklist - Slab and Beam Shuttering Works

Dnyan Deshmukh

Staff member
Slab and Beam Shuttering Works
This checklist helps in doing checking of slab and beam shuttering work.
  • Checklist for Slab and Beam Shuttering Works consist of following checkpoints;
  • Approved formwork drawing available on site
  • Cleaning, oiling for shuttering done
  • Beam bottom and slab bottom level checked
  • Beam width and beam depths as per drawing
  • Plumb of sides of beam checked and found satisfactory
  • Shikhanja spacing as approved
  • Column topi checked and found satisfactory
  • Vertical stoppers provided as approved
  • Sides of beam around toilet sunk provided with sleeves as per drawing
  • Spans after opening have min 450mm overlap and have min 2 bolts
  • Spans are supported by steel props at ends and not in-between
  • Prop size, spacing and condition as per approved drawing.
  • Bracing as per approved drawing.
  • Props are resting on firm surface as per guidelines
  • Top level of Concrete – Marked
  • Tie rod or alternative support (if Required).
  • Opening for electrical outlets if any as per drawing & specification
sample checklist for same is attached herewith.

Checklist is a important record it helps us in order to get work done correctly and it ensure we do not miss any point to check which is important from aspect of Quality of work.
Checklist attached herewith is just a sample provided for your reference, work carried out as per this procedure may have different sets of standards, material specifications, standard operating procedures and terms and conditions for doing that work. This all parameter or some parameter may not match with one you are executing at your Project.
Kindly use it as reference document only to create Checklist. You are free to modify edit, delete add any content in it and use it as per your requirement.
 

Attachments

  • C4M Slab and Beam Shuttering Works.docx
    30.2 KB · Views: 675
  • Like
Reactions: Ansari Tarique