    You can click on enable micro upon opening the sheet in excel.

    You can click on enable micro upon opening the sheet in excel.
  2. Dnyan Deshmukh

    Can anyone please provide excel/word format for site order book, cement register, site hindreance register, test register etc ...

    Most of the formats you can find in below sections of the forum. https://civil4m.com/forums/back-office-engineering.12/ https://civil4m.com/forums/site-engineering-execution.7/ For Quality Related things, you can find it inside below section of the Forum...
  3. Dnyan Deshmukh

    What do you mean by graded aggregate and a single-sized coarsed aggregate?

    Kindly check on Page no 06, Table no 07 - it gives the percentage passing for single size as well as graded aggregates. Clause number 6 of IS 383 gives the definitions of the single size and graded aggregates. Table No 09 gives the passing limits for Fine Aggregates - which comes as a graded...
  4. Dnyan Deshmukh

    Hot work activity in a construction project

    Hot work is mostly related to the fabrication activities where either welding or cutting of metal is involved. Arc welding machines, gas flame cutters are the equipment used in hot works. Before starting such works, a hot work permit need to be taken from the safety department by doing...
  5. Dnyan Deshmukh

    I am kessie Joshua Jack Joe from Ghana.. studied building and Construction in high school.. currently waiting for employment

    Hello Kessie, Good to see you here. Welcome to Construction Community Forum!
  6. Dnyan Deshmukh

    Can anyone share me spreadsheet " Labour productivity " and " equipment productivity " for manpower planning and resource allocation

    you might find below thread useful https://civil4m.com/threads/labour-productivity-analysis-for-mivan-formwork-and-reinforcement-works.8655/
  7. Dnyan Deshmukh

    Hello professionals, This is Saurav Mishra

    Hello Saurav, Good to see you here. Welcome to Construction Community Forum! You can find the things you are looking for in below forum link. https://civil4m.com/forums/back-office-engineering.12/
  8. Dnyan Deshmukh

    Hi, I am Planning and Project Control professional from Azerbaijan.

    Hi Tofik, Good to see you here and thank you for spreading words about Civil4M. Welcome to Construction Community Forum!
  9. Dnyan Deshmukh

    Excel Construction Project Dashboard Sample for Planning Engineers

    Great and awesome dashboard for planning engineer for monitoring and tracking of everything in it.
  10. Dnyan Deshmukh

    Concrete Mix Design Excel Sheet as per IS 10262 - 2019 Guidelines

    Yes there was some problem in logical calculation formula. updated mix design excel sheet is attached in the first post, kindly download it and use it for mix design proportioning.
  11. Dnyan Deshmukh

    QA /QC Engineer

    Hello Brajmohan, Good to see you here. Welcome to Construction Community Forum!
  12. Dnyan Deshmukh

    Hey guys myself Thimmesha Murugeshappa

    Hello Thimmesha, Good to see you here. Welcome to Construction Community Forum!
  13. Dnyan Deshmukh

    Key performance Indicators (KPIs) for quality Management of Construction project /Ready Mix industry??

    KPI's are very simple and easy when you know, why you want to track and improve the performance of 'x' thing. knowing that 'x' thing is very important here because it makes impact on the overall performance of the business and its objective. Giving an Example on what can be a KPI Concrete cubes...
  14. Dnyan Deshmukh

    CONCRETE POURING

    The problem mostly arises due to the following causes 1. The Temperature of the Cement and fineness. 2. Performance of the Admixture. 3. Fines content and absorption levels of fine aggregates. Its easy to control when you are producing concrete in-house by giving instructions to all Transit...
  15. Dnyan Deshmukh

    Method to use fly ash ratio in building structure.....

    PPC cement has 35% Fly Ash already added into it and further to this if you add 50% more fly ash, if the concrete does not attain the required strength it wont give the durability. You will have total 85% Fly ash in your mix, where concrete itself may not have good bond cement and its...