  1. Srinivasan

    Work Procedure for installation of Dado Tiles

    Work Procedure for installation of Dado Tiles Wall tiling works for protection and decoration purpose will be carry out after building structure is finished. Prior to carrying out the wall tiling, the work of concealed plumbing should be finished, including all details having indication for...
  2. Srinivasan

    Work Method Statement for Plastering and Pointing on the Masonry

    Work Method Statement for Plastering and Pointing on the Masonry SCOPE/PURPOSE This procedure covers the methodology to be followed for carrying out plastering and pointing work over the masonry in line with the approved technical specifications. CODES / SPECIFICATION IS 1661 RESPONSIBILITY...
  3. Srinivasan

    Work method Statement for IPS and Tremix Flooring (VDF)

    Work method Statement for IPS and Tremix Flooring (VDF) SCOPE/PURPOSE This procedure covers the methodology to be followed for carrying out IPS Flooring in line with the approved technical specifications. CODES / SPECIFICATION IS 2571 Laying of in-situ cement concrete flooring...
  4. Srinivasan

    Work Method Statement for Plain and Reinforced Cement Concrete PCC and RCC

    Work Method Statement for Plain and Reinforced Cement Concrete PCC and RCC SCOPE The work of Plain Cement concrete shall consist of laying and compacting of cement concrete on excavated earth in accordance with the requirements of Technical Specifications accordingly to lines, grades and cross...
  5. Srinivasan

    Work Method Statement for Various Types of Waterproofing

    Work Method Statement for Various Types of Waterproofing SCOPE / PURPOSE This work procedure narrates the guidelines for carrying out Water proofing treatment for all BOQ items listed under the Contract CODES / SPECIFICATION Tender/Contract Specifications BOQ description IS 2645...