Roles and Responsibilities Of The Mivan Formwork Foreman or Supervisor
Doing Concrete & Kicker Level Survey
Setting out of Pour by Fixing Ply-boards
Fixing Of Mivan Shutters As Per Drawing
De-shuttering , Stacking & shifting Properly
Making Plans For Achieving Cycle time
Removing Of wall ties , PVC Cones etc.
Maintaining House keeping in Working Floor
Check For Damaged Materials & Repairing Of It
Check For Stopper Removing on Time
Check for Cut Outs & Sleeves Openings Are Fixed As per Drawing
Check For Plumb & Line Of Prop length
After De-shuttering Of Sides The Mivan Bracket, Walkway, Handrailing & Safety net Is Fixed Properly Or Note
Before Concreting Check For All Wall ties & Pins & Wadges
Doing Concrete & Kicker Level Survey
Setting out of Pour by Fixing Ply-boards
Fixing Of Mivan Shutters As Per Drawing
De-shuttering , Stacking & shifting Properly
Making Plans For Achieving Cycle time
Removing Of wall ties , PVC Cones etc.
Maintaining House keeping in Working Floor
Check For Damaged Materials & Repairing Of It
Check For Stopper Removing on Time
Check for Cut Outs & Sleeves Openings Are Fixed As per Drawing
Check For Plumb & Line Of Prop length
After De-shuttering Of Sides The Mivan Bracket, Walkway, Handrailing & Safety net Is Fixed Properly Or Note
Before Concreting Check For All Wall ties & Pins & Wadges