Which of the following method is recommended by I.R.C. for design of flexible pavement -
(a) Group Index Method
(b) C.B.R Method
(c) Westegaard Method
(d) none of these.
The correct Answer Is
(b) C.B.R Method
(a) Group Index Method
(b) C.B.R Method
(c) Westegaard Method
(d) none of these.
The correct Answer Is
(b) C.B.R Method