Work Checklist - Post Concrete Inspection Work

Dnyan Deshmukh

Staff member
Post Concrete Inspection Work
This checklist help you in doing post concrete inspection work.
Checklist of Post Concrete Inspection Work consist of following checkpoints;
  • Grade of Concrete - M15 / M20 / M25 / M30 / M35
  • Finishing / Corners
  • Shrinkage / Cracks observed
  • Satisfactory Curing
  • Honeycombing Observed after de-shuttering
  • Formwork line / Level after pouring
  • Steel Exposure on surface
  • Hacking if required
  • Concrete Strength 7 Day
  • Concrete Strength 28 Day
  • Proper de-shuttering
  • Bottom level of beam more than 5.0 meter length
  • Bulging of concrete surface
  • slab top R.L.
checklist is attached in this post.
Checklist is a important record it helps us in order to get work done correctly and it ensure we do not miss any point to check which is important from aspect of Quality of work.
Checklist attached herewith is just a sample provided for your reference, work carried out as per this procedure may have different sets of standards, material specifications, standard operating procedures and terms and conditions for doing that work. This all parameter or some parameter may not match with one you are executing at your Project.
Kindly use it as reference document only to create Checklist. You are free to modify edit, delete add any content in it and use it as per your requirement.
 

Attachments

  • C4M Post Concrete Inspection Works.docx
    30 KB · Views: 438