Work Checklist - Soling Works

Dnyan Deshmukh

Staff member
Soling Works
This checklist provides a checkpoints to ensure during the soling work.
Checklist for soling consist of following points;
  • Quality of the available stone acceptable
  • Compaction of the sub base material done and checked
  • Level of sub base checked
  • Thickness of soling checked
  • Small "Kapchi" stone filled in gaps of laid stone soling
  • Murum spread over the top of soling,watered and compacted
  • Top level of the soling checked
Checklist for soling is attached in this post.
Checklist is a important record it helps us in order to get work done correctly and it ensure we do not miss any point to check which is important from aspect of Quality of work.
Checklist attached herewith is just a sample provided for your reference, work carried out as per this procedure may have different sets of standards, material specifications, standard operating procedures and terms and conditions for doing that work. This all parameter or some parameter may not match with one you are executing at your Project.
Kindly use it as reference document only to create Checklist. You are free to modify edit, delete add any content in it and use it as per your requirement.
 

Attachments

  • C4M Soling Works.docx
    29.7 KB · Views: 502