I want Comparative analysis of reinforcing steel bars from collapsed building and the market.
Quick question! When you cast a concrete slab for a building, and take samples out for compressive stress test, when the test comes back as a fail after the curing process, say after 28 days, what should happen to the already cast floor?
  • Like
Reactions: Rintu Ranjan
Amaladhikari
Amaladhikari
U can again test for core cutter
M
MadeWun
And when the cut cutter test fails too?
HockeyPuck
HockeyPuck
Check your contract - Remove & replace is typically the contractual remedy for correcting non-compliant work.
Can anybody give me AutoCad Drawings to work from home for Hand Rail Detailing, Grating/CHQD plate Layouts as Tekla detailers give these drawing for AutoCad as it is easy to draw them in AutoCad rather than in Tekla. My email ID is neeleshlimaye@yahoo.com WhatsApp No. is +919619962671.
How to Control Water Table seepage under Asphalt Pavement Work?
HockeyPuck
HockeyPuck
Abrar, are you saying that you are seeing groudwater coming up through cracks/joints/seams? Or is are you seeing groundwater leaching out of the sides of the pavement? Is this pavement that you recently installed or is this an existing pavement with the condition?
I am civil engineering student ,,(The Engineer meaning that efficiency of work , economical work ful fill input comprising more grate output received ) ,my Life rule every work do very honestly,with responsibility ,
my contact number 8741828148
my Email anoopbanshiwalhnd98@gmail.com
what is the maximum height of 230mm fly ash brick wall without lintel??
1.Per day is 1m height we are constructed but maximum height of the wall(230mm). In half brick work we have put Reinforcement in every 4 layer or 1m lintel bend provided.
2. 230 mm brick wall height my site -3650mm & 4050mm its ok with out lintel/bend ?
tausif khan
tausif khan
The maximum height for 230mm thick brick wall without lintel is 2.76m.
tausif khan
tausif khan
No you should provide lintel at 2.76 m .