New profile posts

I want Comparative analysis of reinforcing steel bars from collapsed building and the market.
Quick question! When you cast a concrete slab for a building, and take samples out for compressive stress test, when the test comes back as a fail after the curing process, say after 28 days, what should happen to the already cast floor?
  • Like
Reactions: Rintu Ranjan
Amaladhikari
Amaladhikari
U can again test for core cutter
M
MadeWun
And when the cut cutter test fails too?
HockeyPuck
HockeyPuck
Check your contract - Remove & replace is typically the contractual remedy for correcting non-compliant work.
Can anybody give me AutoCad Drawings to work from home for Hand Rail Detailing, Grating/CHQD plate Layouts as Tekla detailers give these drawing for AutoCad as it is easy to draw them in AutoCad rather than in Tekla. My email ID is neeleshlimaye@yahoo.com WhatsApp No. is +919619962671.
How to Control Water Table seepage under Asphalt Pavement Work?
HockeyPuck
HockeyPuck
Abrar, are you saying that you are seeing groudwater coming up through cracks/joints/seams? Or is are you seeing groundwater leaching out of the sides of the pavement? Is this pavement that you recently installed or is this an existing pavement with the condition?
I am civil engineering student ,,(The Engineer meaning that efficiency of work , economical work ful fill input comprising more grate output received ) ,my Life rule every work do very honestly,with responsibility ,
my contact number 8741828148
my Email anoopbanshiwalhnd98@gmail.com