New profile posts

I am civil engineering student ,,(The Engineer meaning that efficiency of work , economical work ful fill input comprising more grate output received ) ,my Life rule every work do very honestly,with responsibility ,
my contact number 8741828148
my Email anoopbanshiwalhnd98@gmail.com
what is the maximum height of 230mm fly ash brick wall without lintel??
1.Per day is 1m height we are constructed but maximum height of the wall(230mm). In half brick work we have put Reinforcement in every 4 layer or 1m lintel bend provided.
2. 230 mm brick wall height my site -3650mm & 4050mm its ok with out lintel/bend ?
tausif khan
tausif khan
The maximum height for 230mm thick brick wall without lintel is 2.76m.
tausif khan
tausif khan
No you should provide lintel at 2.76 m .
Sir I am Anil Bhatia and i am looking for analysis of batching plant - kindly help - the one attached I have reviewed but few doubts - my number is 8860068118
SIR I AM CURRENTLY IN 3RD YEAR CIVIL
AND I WISH TO TAKE UP ESTIMATION AND COSTING AS A CAREER . SIR HOW SHALL I PROCEED FROM HERE ON APART FROM MY SYLLABUS TO GAIN KNOWLEDGE? I HAVE SEARCHED AND NOT REALLY GOTTEN A CLEAR PERSPECTIVE OF THIS DEPARTMENT. HELP WOULD BE LARGELY APPRECIATED. THANK YOU SIR.
hemchand
hemchand
try rics
nicmar after ur college
Hi Deshmukh G , Very good morning

I am facing the one little problem in the calculation , curing compound efficiency testing according to BS 7542:1992 given the formula in clause No 8 for efficiency , they are not simplify of Ec . I have searched lots of reference but cannt if you have any reference or idea please share to me . we are performing the test & taking Ec=Wc .
  • Like
Reactions: Vinodh29
Dnyan Deshmukh
Dnyan Deshmukh
Ec = Curing Compound Efficiency which is
The efficiency of the curing compound in forming a membrane which reduces moisture loss is calculated from the measured loss in mass of the specimens, after correction for the loss of solvent from the coated specimen.
Dnyan Deshmukh
Dnyan Deshmukh
I do not have any idea about efficiency index formula as i never used it for calculating, but when you are making index by comparing efficiency with controlled sample, your index value will be 1.00+ or 100% + (your curing compound sample will always have less water evaporation than controlled sample)
Pushpendra singh chouhan
Pushpendra singh chouhan
thanks for quick response..........ok
TAMILNADU SOFT SKILL DEVELOPMENT CENTER

ONLINE COURSES FOR PROFESSIONALS AND FINAL YEAR ENGINEERING,ARCHITECT AND STRUCTURE.

To join reg


9790736848
Hello Friends, This is Chirag Kanabar from Jamnagar, Gujarat.

I have done Diploma & AMIE in Civil Engineering. Presently working as a QA/QC manager in Chevrox Construction Pvt. Ltd. (Gujarat). I am having total 11+ years of experience in QA/QC-Civil. I had worked with L&T Hydrocarbon, Shapoorji Pallonji & Co. ltd. and Enercon India Ltd. (Wind mill sector).
My self Rajakumar Pinninti working as QA/QC Engineer at Ghana railway project, Africa in Afcons infrastructure limited....previously worked in GMR and NCC limited and having 5 years work experience in QA/QC dept.I have delivered guest lectures in many no of engineering colleges on Career guidance & industrial Exposure and also on technical topics in my vacation time..I have interacted with more than 20,000 civil stud
Aman kaushik
Aman kaushik
Sir im Aman and im also work in QC , i want to know why we use Admixture in concrete and which type of Admixture is this ??
Mech42
Mech42
Hi Sir,

Can we flood water in Backfilling instead of layer wise compaction?
Praveen Pant
Praveen Pant
Yes you can along with doing roding sourrounding footings,plintg beam to percolate the wate.
I am Civil Engineer had 25 Years of Experience in QMS and Concrete management, worked in various part of India and Abroad, I had been mega Project as QC Head in T2 Mumbai Airport, Dubai World Trade center interchange road, Karwar Naval Base, Qatar Stadium etc
Mech42
Mech42
Sir, Please guide how to maintain Quality on very serious note. How to create Quality Culture?
kranjan
kranjan
Organizing quality meeting gathering all stake holders
Arranging Quality training
Deploy on site workmen training / demo
Recognising good (Quality) performer viz Quality Conscious staff / workmen etc
Audits among all department function
Raise concerns if any then and their
Hope this will make a path to team towards involving quality and their system implementation and adherence.
Good luck