Hi all,
Can any one help me .....We had executed hard rock breaking with machinery ( chiseling ) qty 1230 cum after bill submission, client has denied to pay fully 100 % qty with hard rock and instructed to reduce qty considering soft soil in between rock, boulder which is also seen in site...
Is there any IS code where mentioned bend deduction while calculating cut length of a ring .....
As same client allowing 1D deduction for each bend while same considering 2d .... ........
Kindly share the IS code No if any one have ???? or a calculation from how it obtain ..
I want to know how much cement slurry ( In cum in proportion 1:6 ) we have to pass before starting concrete of slab height more than 30 Mt Vertically through pipe line to pass concrete smoothly.....
Hi All,
How to calculate for future consumption of cement slurry per cum there is any IS code where consumption is mentioned. or any thump rule for cement slurry calculation per cum of poured concrete ????
Factor which effect more consumption like height of pouring point, temperature etc
Can anyone explain the chair details as per IS code which we had provided in slab to maintain proper spacing for both mesh of reinforcement. with specification of his both leg max length if any mentioned in IS code.
Good Evening Sir,
What percentage should be taken or add on dry density of cement for plaster or brick work while calculating the actual consumption of cement and sand.