Recent content by Amit Baluni

  1. A

    Excavation rate analysis

    Can any one share excavation rate analysis for soil depth more than 4.0 meter but within 6.0 mtr.
  2. A

    Rate Analysis

    If any one having rate analysis of plum concrete please share.
  3. A

    Hard rock measurement

    Hi all, Can any one help me .....We had executed hard rock breaking with machinery ( chiseling ) qty 1230 cum after bill submission, client has denied to pay fully 100 % qty with hard rock and instructed to reduce qty considering soft soil in between rock, boulder which is also seen in site...
  4. A

    Is there any IS code where mentioned bend deduction while calculating cut length of a ring ....

    Is there any IS code where mentioned bend deduction while calculating cut length of a ring ..... As same client allowing 1D deduction for each bend while same considering 2d .... ........ Kindly share the IS code No if any one have ???? or a calculation from how it obtain ..
  5. A

    Cement slurry

    I want to know how much cement slurry ( In cum in proportion 1:6 ) we have to pass before starting concrete of slab height more than 30 Mt Vertically through pipe line to pass concrete smoothly.....
  6. A

    Dry density of cement should be 30 % or 54 % of wet cement ???

    Sir Please explain with more examples ....
  7. A

    Cement slurry

    Hi All, How to calculate for future consumption of cement slurry per cum there is any IS code where consumption is mentioned. or any thump rule for cement slurry calculation per cum of poured concrete ???? Factor which effect more consumption like height of pouring point, temperature etc
  8. A

    Chair & Pin As per IS code.

    thanks for giving such information
  9. A

    Chair & Pin As per IS code.

    Can anyone explain the chair details as per IS code which we had provided in slab to maintain proper spacing for both mesh of reinforcement. with specification of his both leg max length if any mentioned in IS code.
  10. A

    What is the factor for segregation of concrete

    What is the factor for segregation of concrete what is the precaution should take before placing of concrete ????
  11. A

    To increase concrete flow mixing additional water or admixture on TM at site is impact on strength of concrete or any ??

    To increase concrete flow mixing additional water or admixture on TM at site is impact on strength of concrete or any damage is happened.
  12. A

    Dry density of cement should be 30 % or 54 % of wet cement ???

    From were you got this information, if mention in IS CODE can you share ????
  13. A

    Why theoretical concrete quantity is more than actual poured qty if there is mass concrete or by mechanical concrete

    thanks sir for your reply but can you explain more points which also effect.
  14. A

    Dry density of cement should be 30 % or 54 % of wet cement ???

    Good Evening Sir, What percentage should be taken or add on dry density of cement for plaster or brick work while calculating the actual consumption of cement and sand.