Material Quality Auditing Procedures to be implemented at site
An Excellent Quality System For Setting Benchmarks in Construction


Periodic Inspection & Testing are the two integral points of our Quality System that is described as under.

Objective:

The Inspection & Testing of Products & Services To ensure that all the operations are carried out as per the laid procedures to meet specified requirements.

Responsibility:

Documenting, Implementing and Updating The overall responsibility of Inspection, Testing, Updating & Implementation of the system lies with the site in-charge.

Stages of Inspection & Testing:

1. Construction drawings from the consultants are verified, clarifications obtained before implementation.

2. Cement & Steel are released as per the project requirement.

3. In the event of non-conformity to specified requirements, the desired materials are subjected to immediate recall and replacements.

Inspection & Test Records:

In case, on testing if the materials do not meet the specified requirements, materials are summarily rejected.

Control Over Inspection, Measuring & Test Equipment's:

Instruments are selected and ordered on the basis of pre-define parameters of accuracy and precision.
All Testing Instruments are calibrated in required frequencies.
All Inspection and Testing instruments / equipment's are handled by trained, authorized personnel to ensure consistent accuracy.

Corrective Actions:
In case the desired results are not arrived at, step wise corrective actions are taken:

1. Ascertain complaints and product non-confirmations
2. Investigate causes with regards to product, process and quality system.
3. Application of the corrective action to eliminate causes of non-confirmation.
4. Ensure effective application of corrective action by identifying responsible personnel, delegating work and fixing target for completion.

Preventive Action:

Derive out an appropriate preventive action plan on the basis of analysis of the information collected viz rejection notes, audit results, study of quality and documentation related to non confirmative reports etc.

Internal Quality Audits:

Objective

1. To ensure that all quality activities and related results must comply with the set standards.
2. To determine the overall effectiveness of the quality system employed as per the plan and documents.

Statistical Technique:

Objective

To ensure efficient use of Statistical Techniques for cross checking the process of corrective controls in terms of their application and Implementation.
 
Material Quality Auditing Procedures to be implemented at site
An Excellent Quality System For Setting Benchmarks in Construction


Periodic Inspection & Testing are the two integral points of our Quality System that is described as under.

Objective:

The Inspection & Testing of Products & Services To ensure that all the operations are carried out as per the laid procedures to meet specified requirements.

Responsibility:

Documenting, Implementing and Updating The overall responsibility of Inspection, Testing, Updating & Implementation of the system lies with the site in-charge.

Stages of Inspection & Testing:

1. Construction drawings from the consultants are verified, clarifications obtained before implementation.

2. Cement & Steel are released as per the project requirement.

3. In the event of non-conformity to specified requirements, the desired materials are subjected to immediate recall and replacements.

Inspection & Test Records:

In case, on testing if the materials do not meet the specified requirements, materials are summarily rejected.

Control Over Inspection, Measuring & Test Equipment's:

Instruments are selected and ordered on the basis of pre-define parameters of accuracy and precision.
All Testing Instruments are calibrated in required frequencies.
All Inspection and Testing instruments / equipment's are handled by trained, authorized personnel to ensure consistent accuracy.

Corrective Actions:
In case the desired results are not arrived at, step wise corrective actions are taken:

1. Ascertain complaints and product non-confirmations
2. Investigate causes with regards to product, process and quality system.
3. Application of the corrective action to eliminate causes of non-confirmation.
4. Ensure effective application of corrective action by identifying responsible personnel, delegating work and fixing target for completion.

Preventive Action:

Derive out an appropriate preventive action plan on the basis of analysis of the information collected viz rejection notes, audit results, study of quality and documentation related to non confirmative reports etc.

Internal Quality Audits:

Objective

1. To ensure that all quality activities and related results must comply with the set standards.
2. To determine the overall effectiveness of the quality system employed as per the plan and documents.

Statistical Technique:

Objective

To ensure efficient use of Statistical Techniques for cross checking the process of corrective controls in terms of their application and Implementation.
Check Technical new product Drainage system
 

Dnyan Deshmukh

Staff member
Why you posted your number here.
If you want to show a new system you have or you sell.
Kindly make new thread in appropriate section and post there.