Roles and Responsibility of QA/QC Engineer


Hi friends, today i would like to tell you something about roles and responsibility of QA/QC Engineer. QA and QC are two different terms which shows Quality Assurance and Quality Control. This two are different responsibilities and can be own by a one or more person at execution site.

So lets we start understanding the responsibility and roles played by this two designation.

Roles and Responsibility of Quality Assurance;-

Quality Assurance it self tell us that, this position assure the better quality product during all stages of work. To assure the better quality of product he need to make a Project Specific Quality Plan (PQP).

To make a PQP one should need to understand the following thing
  1. What kind of project it is?
  2. What methods of work going to be applied at that project? ( Example: shuttering method is conventional shuttering or Aluminum formwork like Mivan or any other)
  3. What are the expectation of Client / Customer from this project.
  4. Specifications / Codes applicable for the project.
Ones he knows all above things he can make a Project Specific Quality Plan.

PQP must include the following things:
* Work procedures for all activities which are finalized.
* Checklists for all activities to have a record of work done is as per procedure or not.
* Inspection and Test Plan for Materials which shows frequency of testing, test which need to be carried out, place of conducting the tests and there acceptance limits as per the specifications or codes.
*Inspection and Test plan for activities : should include the level of process checking, there frequency and there acceptable limits for each activity.

So when you make a Project Specific Quality Plan you have completed the first responsibility of QA Engineer.

Civil engineering is field where improvements in products and process through advancement of application tools or other changes are tend to happen over a period of time.

so second responsibility of QA Engineer is, when there is a change in process or improvement is made. he need to make a work procedure for that activity and should get it approved from the higher authority for implementation at site.
To implement the new methodology at site, he should provide the training to staff and workmen through mock- up and sample works.

At the time of issuing revised procedure, he need to ensure all old procedure were taken back from engineers.

So when you make a procedure for a particular activity, get it approved from appropriate level of authority and deploy it at site through orientation / mock- up. You have successful done your second responsibility at site.

Roles and Responsibility of Quality Assurance (bullet points);-
Set up and monitor QA/QC activities at site

Identify material sources, and interface with QC engineer for tests

Plan and coordinate for conduct of Product Quality Ratings

Inspection and approval for incoming materials

Escalate issues to Management

Preparation of project quality plans and taking approval from appropriate authorities.

Ensure preparation and incorporation of all the Work Methods as required by the contract and corresponding Inspection & Test Plans and Formats.

Assist Site Management in effective implementation of approved quality plans and QC procedures

Roles and Responsibility of Quality Control (bullet points);-
Identify material sources, and conduct material tests and ensure conformity with specifications & standards

Conduct Routine Tests on materials & workmanship as per ITP for conformance and maintain records.

Identify, Calibrate and maintain Master List of Testing and Measuring Equipment
 
Roles and Responsibility of QA/QC Engineer


Hi friends, today i would like to tell you something about roles and responsibility of QA/QC Engineer. QA and QC are two different terms which shows Quality Assurance and Quality Control. This two are different responsibilities and can be own by a one or more person at execution site.

So lets we start understanding the responsibility and roles played by this two designation.

Roles and Responsibility of Quality Assurance;-

Quality Assurance it self tell us that, this position assure the better quality product during all stages of work. To assure the better quality of product he need to make a Project Specific Quality Plan (PQP).

To make a PQP one should need to understand the following thing
  1. What kind of project it is?
  2. What methods of work going to be applied at that project? ( Example: shuttering method is conventional shuttering or Aluminum formwork like Mivan or any other)
  3. What are the expectation of Client / Customer from this project.
  4. Specifications / Codes applicable for the project.
Ones he knows all above things he can make a Project Specific Quality Plan.

PQP must include the following things:
* Work procedures for all activities which are finalized.
* Checklists for all activities to have a record of work done is as per procedure or not.
* Inspection and Test Plan for Materials which shows frequency of testing, test which need to be carried out, place of conducting the tests and there acceptance limits as per the specifications or codes.
*Inspection and Test plan for activities : should include the level of process checking, there frequency and there acceptable limits for each activity.

So when you make a Project Specific Quality Plan you have completed the first responsibility of QA Engineer.

Civil engineering is field where improvements in products and process through advancement of application tools or other changes are tend to happen over a period of time.

so second responsibility of QA Engineer is, when there is a change in process or improvement is made. he need to make a work procedure for that activity and should get it approved from the higher authority for implementation at site.
To implement the new methodology at site, he should provide the training to staff and workmen through mock- up and sample works.

At the time of issuing revised procedure, he need to ensure all old procedure were taken back from engineers.

So when you make a procedure for a particular activity, get it approved from appropriate level of authority and deploy it at site through orientation / mock- up. You have successful done your second responsibility at site.

Roles and Responsibility of Quality Assurance (bullet points);-
Set up and monitor QA/QC activities at site

Identify material sources, and interface with QC engineer for tests

Plan and coordinate for conduct of Product Quality Ratings

Inspection and approval for incoming materials

Escalate issues to Management

Preparation of project quality plans and taking approval from appropriate authorities.

Ensure preparation and incorporation of all the Work Methods as required by the contract and corresponding Inspection & Test Plans and Formats.

Assist Site Management in effective implementation of approved quality plans and QC procedures

Roles and Responsibility of Quality Control (bullet points);-
Identify material sources, and conduct material tests and ensure conformity with specifications & standards

Conduct Routine Tests on materials & workmanship as per ITP for conformance and maintain records.

Identify, Calibrate and maintain Master List of Testing and Measuring Equipment
Tq sir
 
Roles and Responsibility of QA/QC Engineer


Hi friends, today i would like to tell you something about roles and responsibility of QA/QC Engineer. QA and QC are two different terms which shows Quality Assurance and Quality Control. This two are different responsibilities and can be own by a one or more person at execution site.

So lets we start understanding the responsibility and roles played by this two designation.

Roles and Responsibility of Quality Assurance;-

Quality Assurance it self tell us that, this position assure the better quality product during all stages of work. To assure the better quality of product he need to make a Project Specific Quality Plan (PQP).

To make a PQP one should need to understand the following thing
  1. What kind of project it is?
  2. What methods of work going to be applied at that project? ( Example: shuttering method is conventional shuttering or Aluminum formwork like Mivan or any other)
  3. What are the expectation of Client / Customer from this project.
  4. Specifications / Codes applicable for the project.
Ones he knows all above things he can make a Project Specific Quality Plan.

PQP must include the following things:
* Work procedures for all activities which are finalized.
* Checklists for all activities to have a record of work done is as per procedure or not.
* Inspection and Test Plan for Materials which shows frequency of testing, test which need to be carried out, place of conducting the tests and there acceptance limits as per the specifications or codes.
*Inspection and Test plan for activities : should include the level of process checking, there frequency and there acceptable limits for each activity.

So when you make a Project Specific Quality Plan you have completed the first responsibility of QA Engineer.

Civil engineering is field where improvements in products and process through advancement of application tools or other changes are tend to happen over a period of time.

so second responsibility of QA Engineer is, when there is a change in process or improvement is made. he need to make a work procedure for that activity and should get it approved from the higher authority for implementation at site.
To implement the new methodology at site, he should provide the training to staff and workmen through mock- up and sample works.

At the time of issuing revised procedure, he need to ensure all old procedure were taken back from engineers.

So when you make a procedure for a particular activity, get it approved from appropriate level of authority and deploy it at site through orientation / mock- up. You have successful done your second responsibility at site.

Roles and Responsibility of Quality Assurance (bullet points);-
Set up and monitor QA/QC activities at site

Identify material sources, and interface with QC engineer for tests

Plan and coordinate for conduct of Product Quality Ratings

Inspection and approval for incoming materials

Escalate issues to Management

Preparation of project quality plans and taking approval from appropriate authorities.

Ensure preparation and incorporation of all the Work Methods as required by the contract and corresponding Inspection & Test Plans and Formats.

Assist Site Management in effective implementation of approved quality plans and QC procedures

Roles and Responsibility of Quality Control (bullet points);-
Identify material sources, and conduct material tests and ensure conformity with specifications & standards

Conduct Routine Tests on materials & workmanship as per ITP for conformance and maintain records.

Identify, Calibrate and maintain Master List of Testing and Measuring Equipment
 

Attachments

  • 1. Quality Assurance and Quality Control.pdf
    2.2 MB · Views: 163
  • Like
Reactions: Dnyan Deshmukh
Dear sir
My name is mahesh right now I am trying quality control and quantity assurance but I don't know how search please help
 

Attachments

  • 1.maheshcv.pdf
    93.8 KB · Views: 43