Description- in my site rmc plant untill M25 mix there Is have mix design proportions but m30 dont have mix design the plant operator asking to me sir m30 design mix we dont have i need m30 that time for 1cumec they asking me sir how much quantity of materials used I tell to me sir I will dispatch viz,,, cemet ,aggregate, coarse aggregates ,and water cemet ratio..
So pls suggest me how to did calculations for required quantiitys of materials...
So pls suggest me how to did calculations for required quantiitys of materials...