Can anyone suggest me the best and safest way to excavate earth for placing UG RCC tank(precast) having a depth of 6 mtr, (16x10 mtrs) on wet land ? I have prepared a plan with 35 deg cut and 45 deg cut for the stability and safety in which lot of extra excavation to be done. Is anything else we can go which would be cost as well as time effective ?