Recent content by Narendra

  1. Narendra

    "BIS Leads the Way: A Game-Changer for the RMC Industry in India"

    In a resounding testament to the commitment to quality, safety, and sustainability in the construction industry, the Bureau of Indian Standards (BIS) took a significant step forward on October 26, 2023. BIS organized the first-ever awareness program for the Ready Mixed Concrete (RMC) Process...
  2. Narendra

    Awareness Program on RMC System Certification as per IS/ISO 9001 along with Process Certification as per IS4926 in Pune Region on 26th October 2023

    महोदय/महोदया, Greetings from the Bureau of Indian Standards! Bureau of Indian Standards (BIS), the National Standards Body of India has been at the forefront of ensuring quality products and services in India. We're committed to developing and publishing Indian Standards, implementing...
  3. Narendra

    Which of the following is correct method of Beam Shear stirrups?

    Hello members Accordingly to you, please Comment. Which of the following is correct way of providing 4legged stirrups in beam.
  4. Narendra

    Column Casting Issue

    Dear All This is observed that at may location that during casting of vertical RCC members (viz. Columns, Shear - walls, etc) top 50-70 mm of layer contains only cement and fly ash slurry. How it will affect my structure.
  5. Narendra

    Fly-ash or Pozzolanic Material Test - Loss on Ignition

    Loss on Ignition (Refer IS 1727: 1967, Clause5.3, Page No.8 - attached) Ignite I.00 g of the air-dried, finely ground sample in a platinum crucible of 20 to 25 ml capacity by placing it in a muffle furnace at 1000 f 25°C to constant weight ( for about 20 to 30 minutes ). Air should have free...
  6. Narendra

    How much quantity of water required for curing

    How much quantity of water required for curing of: 1) For concrete of 10cu-m or 10sq-m 2) For blockwork of 10sq-m 3) For plastering of 10sq-m
  7. Narendra

    sent

    sent
  8. Narendra

    Research Methodology

    Dear readers This is a very common mistake done by everyone while doing research/project, that we do not understand what is the difference between Abstract and Synopsis. So, here I am giving you the four major differences which help you all o understand the difference between two...
  9. Narendra

    SBI YONO Quiz - Scholarship up to 3.6Lakh (For UG & PG Students)

    SBI yono presents Numero yono – an exciting and interactive campus quiz for all UG and PG Students. This initiative provides a great platform to compete with the smartest quizzing minds across India. This innovative contest is your gateway to be eligible for an annual scholarship of up to Rs...
  10. Narendra

    CADD Quest 23rd & 24th ,February 2019

    Hurry Grab your opportunity today! CADD Quest 2019Scholarship up to 50% +Assured Paid Internship for top 1000 CADD Quest is a scholarship initiative that was started over 2 decades ago with the aim of providing more and more students the opportunity to gain industry-ready skills. We are elated...
  11. Narendra

    Is the lapping of bar done correctly?

    As per IS:13920-1993, the lap length be provided ONLY in the middle half of column and not near its top or bottom ends (Ref attached Figure). Also, only half the vertical bars in the column are to be lapped at a time in any storey. Further, when laps are provided, ties must be provided along the...
  12. Narendra

    Final Year Engineering Projects

    SEISMIC ANALYSIS OF STRUCTURE WITH VARIED DAMPING RATIOS ON SEISMIC ZONE 4 Author:- Ankita Narvekar1, Dipanshu Kambli2, Sagar Rana3, Shubhansu Mishra4, Jaydeep Chougale5 Source:- IJCESR Abstract More than 50% area in India is prone to damaging earthquakes. Some great Indian earthquakes such...
  13. Narendra

    Final Year Engineering Projects

    Cost Estimation Model (CEM) of Buildings by ANN (Artificial Neural Networks) Author:- Bipin Pal1 , Ashtaveer Mhashilkar2 , Anjali Pandey3 , Bhavesh Nagphase4 , Viren Chandanshive5 Source:- International Advanced Research Journal in Science, Engineering and Technology Abstract: Cost...
  14. Narendra

    IEI, PEATA to seek registration of geotechnical engineers

    Institution of Engineers (IEI) and the Practising Engineers, Architects and Town Planners Association (PEATA) will hold a meeting in this regard on July 3 A week after a portion of Lloyd’s Estate residential towers’ compound wall collapsed into an adjoining pit in Wadala, the Institution of...
  15. Narendra

    Site inspection progress report

    Hey Shubham, I have not worked on site for more than 2 months, but as far as my knowledge and information is concerned as an Engineer you have to take care of Site Work Progress (also called daily progress report), Labour Attendance report and Record of Material (Available or consumed regularly)...